Exchange 2013 SP3 CU10
Moving mailboxes from Ex2010 to Ex2013 and seeing the following on mailbox server 2013:
Replication for database DB-001 is not flushed yet. Constraint: SecondCopy, number of copies: 2 (1 healthy passives, 1 active in site 'Site-HO'), minimum replay time: 8/9/2016 12:39:47 PM, maximum replay time: 8/9/2016 12:39:47 PM, commit time: 8/9/2016 12:39:53 PM. Failure reason: Database a4c662c6-017f-4973-9b5c-49d735d42914 doesn't satisfy the constraint SecondCopy because the commit time 8/9/2016 12:39:53 PM isn't guaranteed by replication time 8/9/2016 12:39:47 PM.
The move completes successfully though, All goes well. Thoughts?? Thank you