So we have 2 Exchange 2010 SP3 servers- 1 east coast and 1 west coast which are in a 2 member replicated DAG (plus one quorum node). Both are MBX/CAS/HUB servers. We need to physically move the east coast server which will require about 4 hours downtime.
We also figured this would be a good time to upgrade the latest MSFT patches as we are a bit out of date. What is the proper procedure "step by step" for gracefully relocating a server and restoring DAG replication? Maintenance mode? Relocate each
database?
-John